Download Township Fee Schedule PDF

UCC FEE SCHEDULE – 2023

Residential Building Permit Fee Schedule:

New Construction  $0.37 per Gross SF, $400 min
Additions $0.42 per Gross SF, $300 min
Repairs and Alterations  1.2% of Construction Cost, $105 min
Manufactured Homes  $0.27 per Gross SF, $200 min
Swimming Pools Above Ground  $100 / In-Ground $210
Demolition $105 min

Non-Residential Building Permit Fee Schedule:

New Construction  $.42 per square foot, $425 min
Additions $.52 per square foot, $425 min
Repairs and Alterations  1.7% of Construction Cost, $425 min
Demolition $1.7% Demolition Estimate, $105 min

Plan Review Schedule:

Residential $105 per Dwelling/Unit
Non- Residential  $0.12 per Gross SF, $840 min
Minimum Fee  $105, unless otherwise listed

All permit fees listed above are the initial amount to be collected at the time of application. If re-inspection is required due to deficiencies, additional fees may be incurred. All permits subject to $4 DCED fee as per State Act 13. Applicant is responsible for all fees and costs prior to final inspection or occupancy.

Other:

Certified Inspector $105 per hour
Code Enforcement  $52 per hour

All hourly rates are port-to-port and will include related office/reporting time as applicable.

Municipal Permits
All permit fees listed are application fees only. Applicant is additionally responsible for all related costs, including inspection(s), as may be required by local municipality(ies) or entities having jurisdiction.